Project Planning Portrait Whiteboard 48" x 36" by CreativeSafetySupply

Project Planning Portrait Whiteboard 48" x 36"

$575.85
Skip to product information
Project Planning Portrait Whiteboard 48" x 36" by CreativeSafetySupply

Project Planning Portrait Whiteboard 48" x 36"

$575.85

Product Overview

The CreativeSafetySupply Project Planning Portrait Whiteboard 48" x 36" is a Dry Erase Boards product by CreativeSafetySupply. It features magnetic dry-erase surface – vinyl-printed surface resists stains and ghosting.

Key Features

  • Magnetic Dry-Erase Surface – Vinyl-printed surface resists stains and ghosting for long-term visibility and smooth writing performance
  • Easy Installation – Includes mounting brackets and hardware for secure and hassle-free wall mounting
  • Durable Aluminum Frame – 1" aluminum border paired with a 2.5" deep aluminum tray for convenient accessory storage
  • Usable Writing Surface – Writing area measures 2" less than the board's total dimensions

Why Choose the CreativeSafetySupply Project Planning Portrait Whiteboard 48" x 36"

The CreativeSafetySupply Project Planning Portrait Whiteboard 48" x 36" offers magnetic dry-erase surface – vinyl-printed surface resists stains and easy installation – includes mounting brackets and hardware. These features make the CreativeSafetySupply Project Planning Portrait Whiteboard 48" x 36" a strong option in the Dry Erase Boards category.

Best For

The CreativeSafetySupply Project Planning Portrait Whiteboard 48" x 36" is best suited for: Office.

Quick Summary

The CreativeSafetySupply Project Planning Portrait Whiteboard 48" x 36" is a Dry Erase Boards product by CreativeSafetySupply. Brand: Creative Safety Supply. Color: White. Material: Aluminum, Metal, Vinyl. Recommended Uses For Product: Office. Mounting Type: Wall Mount. Price: $575.85.

Product Specifications

Specification Details
Brand Creative Safety Supply
Color White
Material Aluminum, Metal, Vinyl
Recommended Uses For Product Office
Mounting Type Wall Mount

You may also like